Jump to main content
myAMAZONE
Operating Manual - KE 2502-150, 3002-150, 3002-190, 3002-240, 3502-190, 4002-190, 4002-240
Search
Index
Preparing the machine
Back
Calculating the required tractor characteristics
Adjusting the three-point mounting frame
Preparing the universal joint shaft
Installing the universal joint shaft on the implement
Coupling the implement
Preparing the implement for operation
Preparing the machine for road travel
Operating Manual - KE 2502-150, 3002-150, 3002-190, 3002-240, 3502-190, 4002-190, 4002-240
Preparing the machine
Preparing the machine
Calculating the required tractor characteristics
Adjusting the three-point mounting frame
KE 240 implements
KE 150/190 implements
Preparing the universal joint shaft
Installing the universal joint shaft on the implement
Coupling the implement
Driving the tractor towards the implement
Coupling the three-point mounting frame
Coupling the hydraulic hose lines
Coupling the lighting for road travel
Coupling the universal joint shaft
Coupling the seed drill
Preparing the implement for operation
Manual adjustment of the tine working depth
Hydraulic adjustment of the tine working depth
Adjusting the working height of the levelling board
Adjusting the working depth of the rigid side guide plates
Adjusting the working depth of the extendable side guide plates
Adjusting the spring tension of the rigid side guide plates
Adjusting the spring tension of the extendable side guide plates
Adjusting the scraper on the roller
Preparing the track marker for operation
Preparing the wheel mark eradicator for operation
Adjusting the speed of the tines
Adjusting the lower link catch hook
Preparing the liftpack system for operation
Preparing the GreenDrill for operation
Preparing the machine for road travel
Preparing the track markers for road travel
Moving the extendable side guide plates in transport position
Preparing the liftpack system for road travel
Switching off the work lights