Adjusting the lower link catch hook
- Loosen the nuts 1 and remove them.
- Remove the bolts 3.
NOTE
The closer the seed drill is attached behind the roller, the lower the lifting force requirement.
- Move the lower link catch hooks 2 into the desired position.
- Install the bolts.
- Install the nuts and tighten them.
- After 5 hours of operation, check the bolt connection for tight fit.
